南京为先科技's SiteMap
最新文章
Unit 01 Sulfur Melting and Metering
Unit 01 Sulfur Combustion and SO₂/SO₃ Conversion
Unit 02 Air Drying Unit
Unit 03 Sulphonation/Sulfonation
Unit 03 Ageing and Stablization
Unit 03 Exhaust Gas Treatment
Unit 07 Pump Neutralization Unit
Unit 11 Alpha Olefins Hydrolisis
Unit 16 AOS chilling Water Supply
Turnkey Sulphonation Plant
Unit 68 Waste Heat Recovery
Reactor
Unit 79 Neutralization and Dioxane Stripping
Aging Vessel
Stripping tower
Neutralization Reactor
ESP
Converter
Heat-Pipe Exhchanger
Control System
Unit 69 Reaction Heat Recovery
Unit 05 Tank Field
Unit 38 Waste Water Crystallization
Unit 06 Recycle Water Station
Unit 15 SLES pH Adjusting
LABSA-Na, AOS, SLS products drying unit (needles type or powder)
Exhaust Gas Circulation Process
3TPH sulfonation/suphonation plant commissioning in Pakistan!
The 180-tube 7.5tph LABSA 10tph SLES and 15tph AOS Manufacturing Plant
Turkey 6tph LABSA 8tph SLES Turnkey Plant
INDONESIA Sulphonation plant 6t/hr capacity commissioning!
SLES plant 8t/hr commissioning successfully!
5t/hr and 6t/hr plant successful commissioning
First 10t/hr ESP installation start in May 2020
WEIXIAN second set 6t/h LABSA&SLES plant commissioned in India
WEIXIAN 3t/h LABSA turnkey new project in Vietnam
WEIXIAN has commissioned 3.8t/h LABSA&SLES plant in HENAN Province,China
WEIXIAN 3T/H SULPHONATION PLANT WAS COMISSIONING SUCCESSFUL IN PAKISTAN
WEIXIAN SECOND 6T/H SULPHONATION PLANT MANUFACTURING DONE
1.6T/H SLES plant commissioning successful
Guangzhou Liby AOS revamp commissioning successful one time
WEIXIAN Korea 6T Sulphonation Plant Commission Successful
144 Tubes Reactor for Korea 6t/h Sulphonation plant under assemblely
East Afica 1.6T/H LABSA turnkey plant commissioning successful
India 2t/h LABSA,SLES,AOS plant commissioning successful
Vietnam 3.8t/h SLES plant and Anyang 3.8t/h SLES neutralization revamping are commissioning successful
Longkou TESILI 2t/h SLES plant commissioning successful
Jinan Dongxin AOS plant was commissioning successful
WEIXIAN reactor and neutralization technology
Hongtai 2t/h SLES plant commissioning successfully
sasol(china)1.6T/H ballestra SLES plant revamp successful
2T/H LABSA plant for Xinxiang Hongtai has running successful in 2013.9
3.8T/H LABSA,SLES plant for Lianshui Xinyuan has running successful in 2013.9
The revamping project of Beijing P&G sulphonation plant have running successful
The Second Gengration 90 Pipe Sulphonation Reactor of WEIXIAN had Run Sucessful in Shaoguan,Xinya
test successful in hebei provice
LAS Analysis method
waste hot air heat energy recovery for trial run successful in sichuan jintong
shaoguan xingya labsa,aes,aos trial run successful
good news : PTR test successful
the new develop for stripper-dioxane
new technology for waste hot air heat energy recovery
WEIXIAN supplied a 1000kg/h sulphonation plant
WEIXIAN supplied a 2000kg/hr sulphonation plant
WEIXIAN supplied a new ESP
WEIXIAN supplied a 2000kg/hr LABSA plant
WEIXIAN supplied a heat recovery unit
WEIXIAN supplied a single tube MES pilot plant
The special report at the 27th China annual meeting of surfactant soap and detergent industry
The market forecast of MES and LABSA
72 hours running test report for 2T/h film sulphonation plant of ZHONGQING YILAN
01单元融硫和计量
02单元空气干燥
01单元燃硫和SO₂/SO₃转化
交钥匙装置
磺化器
老化器
03单元磺化
汽提塔
03单元老化水解
03单元尾气处理
中和反应器
07单元泵式中和
静电除雾器
11单元 AOS生产
转化塔
16单元 AOS冷冻水
热管换热器
68单元 余热回收
控制系统
79单元中和汽提脱二噁烷
69单元 反应热回收
05单元 罐区
06单元 循环水站
38单元 碱洗液氧化蒸发结晶
15单元 SLES pH调整单元
尾气循环工艺
LAS,AOS,K12活性物干燥 粉状 针状
巴基斯坦3吨时磺化装置—烷基苯磺酸, SLES成功开车!
为先7.5吨时180管磺化装置7.5吨时 LABSA,10吨时 SLES 和 15吨时 AOS
土耳其6吨时144管磺化装置 LABSA SLES 成功开车!
印度尼西亚交钥匙工程6吨时LABSA和SLES装置成功运行
为先8吨AES磺化装置成功开车,稳定运行!
南京为先6吨时磺化器国内项目成功运行
国内磺化装置第一台10吨时静电除雾器开始安装
南京为先第二套6吨时磺化装置试车成功
为先越南3吨时磺酸项目试车成功(LABSA)
南京为先中国3.8吨时LABSA,SLES 项目试车成功
南京为先巴基斯坦3吨时磺化装置一次试车成功
南京为先第二套6吨时磺化装置装配完成
南京为先东非AES装置一次试车成功
广州立白AOS改造一次试车成功
南京为先韩国6吨装置试车成功
南京为先韩国MWC公司6t/h磺化装置核心设备磺化器正在装配
印度2t/h LABSA,SLES,AOS装置试车成功
东非1.6t/h LABSA交钥匙工厂试车成功
越南3.8t/h AES和安阳兴亚3.8t/h AES中和改造试车成功
附件4 热管式余热回收
附件3 AES的中和工艺概述
附件2 为先磺化器、中和汽提79单元和引进磺化器、中和工艺的对比
附件1 新一代多管膜式磺化器的改进
龙口特丝丽AES装置试车成功
济南东信AOS装置试车成功
南京为先磺化器和中和工艺
宏泰2T/H AES装置试车成功
沙索(中国)Ballestra 1.6T/H AES磺化装置二级中和改造成功
南京为先真空汽提脱二恶烷单元新实践
新乡宏泰2T/H磺酸装置于2013年9月试车成功
涟水新源3.8T/H AES磺化装置于2013年9月试车成功
北京金鱼磺化装置改造试车成功
为先第二代90管磺化器在韶关新亚磺化装置上试车成功
河北石家庄磺化装置试车成功
LAS分析方法
四川金桐余热回收试车成功
静电除雾器(ESP)原理
韶关兴亚LABSA,SLES,AOS试车成功
喜讯:中石油磺化装置试车成功
脱二恶烷技术的新发展
余热回收技术新突破
2010年 为中东某公司提供1000KG/H磺化装置,并提供全厂性设计
09年1月 为广东韶关某公司提供2000kg/hr磺化装置,并提供全厂性设计。
南京为先科技α-磺基脂肪酸甲脂钠盐(MES)生产技术介绍
08年10月 为江苏南京一套3800kg/hr磺化装置更换蝶片柱式静电除雾器,顺利运作。
南京为先科技α-烯烃磺酸盐(AOS)生产技术介绍
08年8月 为山东济南某公司提供的2000kg/hr LAS装置成功开工。
08年8月 为山东济南某公司提供余热回收单元,顺利运作。
生产磺酸(LAS)、脂肪醇(AS)或脂肪醇醚(AES)硫酸盐技术介绍
外置内浮动式SO2冷却器在SO3膜式磺化装置中的应用
08年1月 为浙江某公司提供单管MES中试装置,并顺利运作。
第27届(2007)中国洗涤用品行业年会专题报告
关于MES与LAS的市场预测
磺化控制系统的选择和改造
昆明中轻依兰2T/h磺化装置72小时考核报告
多管膜式SO3磺化装置中磺化率的控制方法