• Location
  • Capacity Kg/h
  • Note
  • Production Date
  • Iran 3
    1600
    Turnkey LAS SLES plant, with Unit 68 Waste Heat Recovery, 37-tube new-gen reactor, Unit 79 Neutralization
    Under Construction
    China MeishanHuimiao
    7500
    7.5TPH LAS SLES SLS AOS plant with 180-tube reactor and waste heat recovery
    2022.2
    China Hunanlichen
    4000+5000
    Unit 69 Reaction Heat Recovery
    2022.2
    China Sichuan Jintung
    3800*2
    Unit 68 Waste Heat Recovery
    Under Construction
    China Yifeng
    120
    3-tube reactor pilot plant
    2022.2
    China Anyangtianhong
    2000
    Reactor and aging vessel
    2022.1
    Bangladesh 2
    2000
    Turnkey LAS plant with Waste Heat Recovery
    Under Construction
    Vietnam 1
    3000
    Adding Unit 68 Waste Heat Recovery
    2022.1
    China Shengtai
    6000+5000
    Turnkey LAS SLES AOS plant
    Under Construction
    China Keshihua
    100000
    Petroleum sulfonate, new process of exhaust circulation, single pipe pilot plant
    2021.11
    China Anhui Jintung
    5000+1000
    Unit 79 Neutralization revamping
    2021.12
    China Sichuan Jintung
    3800
    Unit 79 and 68 revamping
    2021.12
    Ethiopia 1
    3800
    Turnkey LAS plant, with Unit 68, Unit 08 sulfuric acid absorbtion, Unit 38 Waste Water Evaporation and Cystalization
    Under Construction
    Honduras 1
    2000
    Turnkey LAS, with Unit 69, Unit 38 Waste Water Evaporation and Cystalization.
    Under Construction
    Pakistan 1
    6000
    LAS turnkey plant (second), 144-tube new-gen reactor, SLES dilution for the first plant
    Under Construction
    Turkey 1
    6000
    Turnkey LAS SLES SLS plant European Union PED Standard
    2022.2
    Pakistan 3
    3000
    LAS SLES Turnkey plant with Unit 69
    2022.8
    China Shangdongweifang
    3000
    LAS plant
    Under Construction
    Indonesia 1
    6000
    Turnkey LASBSA SLES Unit 68 plant
    2021.11
    Yeman 1
    2000
    Reactor replacing Italian one
    2021.5
    China ZZY Meishan
    3800*2
    Weixian new-gen reactor
    2021.7
    China ZZY Henan
    5000*4
    4 New-gen Reactors with Exhaust circulation process, sulfur buring and SO₃ converting
    2021.11
    Bangladesh
    1000
    Turnkey LAS SLES plant
    2022.2
    India 4
    5000
    Turnkey LAS SLES SLS Unit 69 Reaction Heat Recovery
    2021.4
    Iran 2
    1200
    Turnkey LAS SLES plant
    2022.2
    Pakistan 2
    6000
    Turnkey LAS SLES plant with Unit 68 and SLES Dilution
    2021.2
    China Zhongqing
    3800
    Old plant Exhaust Treatment and organic material recovery revamping, reducing consumption in exhaust 50%+
    2021.11
    China Zhongqing
    6000
    Turnkey SLES plant with Unit 68 Unit 38 and Unit 08
    2021.6
    China Jintai
    2000
    Static-mixing level-controllable aging and stabilization
    2021.1
    China Shandongweifang
    5000
    New-gen reactor replacing old one
    2020.11
    China Shandongjining
    3800
    LAS SLES AOS plant design
    Feasibility study
    India 1
    4000
    Turnkey LAS SLES AOS SLS plant with Unit 69
    2020.9
    China Tianzhi
    3800
    The second Unit 79 Neutralization replacing Double-step Neutralization
    2020.9
    China Anyangtianhong
    800
    19-tube reactor replacing the old
    2020.8
    China Xinxianghuimiao
    1000
    SLS Film scraping, drying, tablet pressing and needle extrusion plant
    2020.8
    China Anhuianqing
    3800
    Weixian reactor replacing Italian one for LAS SLES AOS production
    2020.7